Environmental Management
Projects List
- 2022 | Feasibility Study for the Establishment of Centralised Hazardous Waste Treatment and Disposal Facility.
- 2020 | Environmental Management Plan for the Infrastructure Expansion of Botswana Accountancy College.
- 2020 | Environmental Impact Assessment for the proposed Khawa Dune Challenge and Cultural Festival event in Khawa.
- 2018 | Environmental Management Plan for the Construction of Flats and Associated Infrastructure Lots 62408 and 63238 in Gaborone.
- 2017 | Supervision & monitoring the implementation of EIA Study for BOFINET Underground Fibre Infrastructure Development Selibe Phikwe – Mathathane Route.
- 2017 | Environmental Management Plan for Lake Ngami Conservation Trust Campsites and Boat Stations.
- 2016 | Environmental Management Plan for Goo Moremi Mannonye Conservation Area.
- 2015 | Consultancy Services for Detailed Environmental Management Plan for Replacement of Paje Wellfields Pipeline for Morupule “A” Power Station. Inception Report, Draft EMP Report & Final EMP Report
- 2015 | EIA Study Consultancy Services for BOFINET Underground Fibre Infrastructure Development Selibe Phikwe – Mathathane Route. Inception Report, Draft Scoping Report, Draft EIA Report & Final EIA Report
- 2015 | Supervision & monitoring of the implementation of the EIA study for Botswana Fibre Networks (Pty) Ltd (BoFiNet) Underground Fibre Infrastructure Development Projects – Sekoma to Tsabong Route.
- 2015 | A Services Contract for the Procurement of Minerals Permits from the Department of Mines for the Operation of 5 Borrow Pits.
- 2015 | A Services Contract: “Consultancy Services for Developing an Environmental Impact Assessment and Acquisition of Mining Rights for Three Borrow Pits”. For Mabutsane Sub District Council.
- 2015 | Provision of environmental Impact Assessment (EIA) Consultancy Services for Botswana Fibre Networks (Pty) Ltd (BoFiNet) Underground Fibre Infrastructure Development Projects – Sekoma to Tsabong Routeermit
- 2014 | Consultancy Services for Detailed Environmental Impact Assessment Study for Integration of Masama and Makhujwane Wellfields Boreholes into the North South Carrier Pipeline.
- 2013 | Consultancy Services for Environmental Management Plan (EMP) for the design and equipping of boreholes at Malwele, a booster station, associated interconnecting pipelines and a pumping main to Gaotlhobogwe Water Treatment Plant Reservoir.
- 2012 | Detailed Environmental Impact Assessment Study for Botlhapatlou Groundwater Exploration and Wellfield and Development
- 2011 | Preparation of Environmental Management Plan (EMP) and EMP monitoring for the construction of pipeline and associated installations to transfer water from BPC-Morupule Water Supply pipeline near Mabeleapudi to Paje and Serowe.
- 2011 | Detailed Environmental Impact Assessment Study for Bobonong Groundwater Investigation and Development Project.
- 2010 | Detailed EIA Study for Tsabong and Gantsi Major Village Water Supply Distribution Network Rehabilitation.
- 2010 | Detailed Environmental Impact Assessment Study and EMP monitoring for NSC Connection to Serowe and Rehabilitation of the Water Supply Distribution Network in Serowe.
- 2007 | Environmental Impact Assessment of the Kang-Phuduhudu Regional Groundwater Resources Investigation and Development Project.